How WattCarbon Achieved a 5-Trust-Principle SOC 2 Type II in 6 Months (Without Burning Out Engineering)

When fast-growing engineering teams hear "SOC 2 Type II across all 5 Trust Services Criteria," they have good reason to push back. The traditional mental picture involves lost engineering hours, endless manual screenshotting, context switching, and a sea of follow-up emails from auditors trying to decipher opaque vendor dashboards.

When WattCarbon approached Locktivity six months ago, they had a firm target: obtain a comprehensive SOC 2 Type II report covering Security, Availability, Confidentiality, Processing Integrity, and Privacy by the end of the year.

Six months later, they held their final report in hand. Their verdict on the process?

"You all made it so easy. I still had my work to do, but I love the Github docs sync, and the whole process was easy." - Neil Williams, Head of Engineering - WattCarbon

Here is the story of how developer-native, open-source evidence collection turned a daunting compliance sprint into a high-quality milestone that elevated not just their security posture, but executive confidence in the program itself.

The Challenge: Broad Scope, Tight Timeline, Zero Time for Manual Prep

Achieving a multi-principle SOC 2 Type II report requires demonstrating operational control efficacy over a continuous monitoring window. For WattCarbon, two major challenges stood out:

  1. Operational burden: There is no “GRC” person at WattCarbon. The team is incredibly talented and smart, and dedicated to doing the right thing, but SOC 2 is not their area of expertise, and like most growing companies, SOC 2 had to compete with a roadmap of high-priority product deadlines. Manually collecting proof across GitHub repositories, AWS environments, code scanning, and monitoring platforms would severely derail developer productivity.

  2. Strict Time Constraints: Operating on a 6-month window left no margin for audit delays, missing evidence, or back-and-forth miscommunication with auditors.

They needed a compliance strategy that worked with their existing workflows and tech stack, rather than trying to configure a pre-conceived list of controls that feel like shoving a square peg in a round hole.

The Solution: GRC Infrastructure for Assurance

To tackle the audit without interrupting development, WattCarbon engaged Locktivity for its source evidence collection and audit management capabilities.

1. Evidence Collection at the Source

Rather than relying on manual screenshotting or black-box compliance portals, our open-source engine automatically pulls standard, verifiable evidence straight from the tools developers use every day:

  • GitHub Workflows: Automatically syncing policy repos, pull request change controls, and branch protection settings.

  • Production & Infrastructure: Tracking real-time security configurations across AWS, application monitoring platforms, and static code analysis tools.

2. Continuous Assurance and Audit

The Locktivity platform turns static compliance into a live operational feedback loop. Daily pipelines run Evidence Packs to continuously monitor WattCarbon’s security posture and surface changes in real time. When the audit window opens, Locktivity provides a collaborative review room, allowing the audit team to inspect verifiable, tamper-evident, signed evidence packs directly without disrupting the engineering team.

Compliance becomes an automatic byproduct of day-to-day engineering.

The Secret Weapon: Why an Auditor-Loved Workflow Is a Win for the Customer

One of the biggest bottlenecks in any audit is proving the controls to auditors, from pulling evidence (whether automated in a GRC tool or via manual screenshots) and demonstrating the controls in place through walk-throughs and interviews. Sometimes, it makes one want to pull their hair out- auditees find themselves thinking “didn’t I just show you that?”

Standard compliance tools package data into proprietary dashboards or static reports. Auditors then have to spend hours clarifying how the data was pulled, asking for secondary verification, or requesting "just one more screenshot." And the auditors are pressured to reduce their level of diligence as the tools have promised them near touchless audits.

The Core Advantage: Evidence Packs deliver original, verifiable source data directly to auditors. Rather than relying on third-party system test results, auditors get total control to validate real evidence, automating the workflow without compromising audit integrity.

Because Locktivity’s software packages evidence transparently using open-source specifications (epack.dev), the external auditor was able to audit close to the source. The auditor could directly inspect raw evidence packs, verify git commit histories, and validate AWS configurations in their native context.

How the Auditor's Positive Experience Directly Benefited WattCarbon:

  • ⚡ Reduced Audit Friction: By allowing WattCarbon to operate natively in their existing tools while data synced transparently to the audit team, back-and-forth interruptions were virtually eliminated.

  • 🛡️ Peace of Mind: Transparent evidence lineage meant no last-minute surprises or missing documentation right before report issuance.

The Impact: 6 Months to Full Verification

By pairing deep security advisory expertise with open-source automation, WattCarbon reached their milestone in record time:

  • Timeline: From initial scope definition to holding a final SOC 2 Type II report in hand in 6 months.

  • Scope: 100% coverage across all 5 Trust Services Criteria (Security, Availability, Confidentiality, Processing Integrity, Privacy).

  • Engineering Impact: Near-zero developer distraction, keeping product shipping on track.

  • Leadership Value: Deep security clarity and internal confidence replacing surface-level "checkbox" compliance.

Rethink Your Approach to Compliance

Achieving SOC 2 doesn't have to mean pausing engineering velocity, drowning in screenshots, or settling for a low-quality checkbox exercise. When evidence is open, transparent, and collected directly at the source, auditors get what they need immediately, software teams keep building, and leadership gains genuine confidence in their security posture.

Ready to streamline your next audit?